Edit
  • Photogallery

    MultiBio 50 hot air boiler

    In the figure you can see the connection of the hot-air boiler to the hot air system. The bottom tube pushes the cold air into the heat exchanger and the heated pipe receives heated air for heating the workshop.

    The pressure fans in the picture are not visible because they are hidden in the floor. The volume of heated air is about 2700 m3 / h.

    The boiler is switched by a remote thermostat according to a workshop's decision. It only melts when it is needed. Thanks to the MultiBio burner and the large heat exchanger, the heat is in the workshop within an hour and a half after switching on.

     

  • Interview with customer
ANCHOR_TOP_TITLE

This website uses cookies

This website is using cookies to provide services, personalize ads, and monitor traffic. By continuing to use this site you are agreeing with usage of cookies. More information.